Construction of New Boiler Feed Water Tank
Total Rehabilitation of Spray Pond
Rewind Motor and Overhaul Compressor 20TR Carrier @ Clark, Pampanga
Supply and Installation of 18.7kW Motor for Wastewater System @ Subic
Construction of New 10,000 MT Capacity Molasses Tank @ Tolong Negros Oriental
Rehabilitation Works for 3 Units Molasses Tanks @ Balayan Batangas
Repainting of Hangar @ Clark Pampanga
Installation of Grundfos Pumps with Hydro MPC Controller System @ Clark Pampanga
Installation of Metal Closure @ San Fernando Pampanga
Grundfos Industrial Solutions – Technical Seminar (Subic)
Complete Rehabilitation of the 800 BHP “Cleaver Brooks” Fire Tube @ Ilocos Norte
Supply and Installation of Chiller Unit @ Clark Pampanga
Fabrication and Installation of 40,000 Lts. Elevated Water Tank @ Tarlac City
Supply and Installation of 20 BHP Auxillary Boiler Machine @ San Jose Del Monte Bulacan
Fabrication and Installation of 40,000Lts. Elevated Water Tank @ Capas Tarlac
Hydrotesting and Desooting Services @ San Fernando Pampanga
Supply and Installation of 10 BHP Steam Boiler @ Anao Tarlac